Figure 4
This plot illustrates
the magnitude of changes required of the raw sonic log (red curve
in left track) to fully tie to the seismic data (final sonic is
blue in left track). The drift between the edited sonic log and
seismic data is shown in blue in the right track (scaled from -20
to +20 ms.). The red dotted line indicates that we have two separate
calibrations to make. The break in drift slope occurs at a run splice,
hence the need to treat separate runs individually. The green curve
in the right track shows the final time errors in the tied synthetic
seismogram (typically less than 3 ms.).

|